The PR route starts at Bourne 132kV SS on dual circuit towers, moving south as a single circuit line followed by a Tee off to Stamford on Dual Circuit, Twin conductors (the PRA route). All insulators and fittings associated with the circuit were replaced with composite type sets. Tower steelwork and foundation condition assessements were carried out as part of the preconstruction works.